How long does it take to build a modular home?
How long a HOMBLOX home takes depends on the design and the size of the order, so we give you the schedule in the quote for your home. Assembling the blocks on the plot often takes just one day, because they arrive finished from our hall.
The stages
1. Conversation and a quote for your project.
2. Design and permits: the permit or notification is the owner's responsibility; on request we help you through it.
3. Foundations on the plot.
4. The blocks are built in our hall while the foundations are made.
5. Transport and assembly of the blocks, often in one day.
6. On-site work: joining the blocks, utility connections and finishing.
Why it is faster than a site build
The hall and the foundations work in parallel, weather does not stop the work and walls do not need to dry out.
What makes it take longer
Permits, utility connections, crane access and unusual designs.
Frequently asked questions
How long does assembly on site take?
We often set the blocks in one day; the on-site work after that depends on the project.
Can you build in winter?
Yes, the blocks are built indoors.
When will I know the schedule?
In the quote for your project.